Brook Street Beach Ramp | « previous | index | next » |
02.11.03-SitePlan.jpg
Feb 11, 2003 - Sunrise Beach seawall and ramp site plan drawings by Vine Associates.
This site design plan is from the official "Town of Marshfield MA DPW - Seawall & Stairway Reconstruction Project Contract 2005-5".
Site plan drawings state "deteriorated conc. stairs to be replaced".
|